To ensure that automotive electronics can withstand the voltage transients induced on the power bus, companies use expensive arbitrary waveform generation and coupling networks during the design phase. For production test, however, a simpler and less expensive means for simulating bus voltage variations and transients is required. For many transient tests, all you need is a switching power supply and an electronic load.
Generate Fast Transient Tests with an Electronic Load
Posted by
Bill Martin on Jun 23, 2016 11:30:44 AM
Topics: automotive testing, Electronic Loads, Transient test system, transients